Utility contractors reviewing plans beside an excavator and storm pipe installation

Heavy civil estimating · built from the plans

Price more work.
Miss less scope.

Turn a plan set into editable quantities, crews, materials, equipment, schedules and bid-ready exports—without rebuilding the job in five different tools.

No sales call · Sample project included · Your estimates stay private

The estimate is the evidence

See every number. Change every assumption.

AI starts the work. Your estimator stays in control of quantities, production, labor, equipment, materials, indirects and final bid structure.

Calibrated trace and measure
Drawing-linked quantities
Separate cost breakouts
Bid review before export
ESTIMATE / UTILITIESDRAWING LINKED
ITEMQTYCOST
018" PVC SANITARY
1,240 LF$78,926
0248" STORM RCP
320 LF$63,184
036" C900 WATER
890 LF$51,403
04MANHOLE 4' DIA
8 EA$34,760

LABOR

$84.2K

MATERIAL

$106.4K

EQUIPMENT

$37.7K

One connected bid workflow

From drawing sheet to bid day.

01

Read the plans

Upload the drawing set. AI identifies scope and connects quantities to the source sheet.

02

Build the estimate

Review separate labor, material and equipment costs. Change any assumption or rate.

03

Pressure-test the bid

Run scope checks, compare production, group pay items and review risk before export.

04

Schedule and submit

Build a 4×10 CPM schedule and export bid, agency and accounting-ready files.

01 / SITE UTILITIES

Pipe scope tied back to the drawing.

Measure water, sewer, storm, power and gas. Every line item keeps its drawing page, location and highlighted source geometry close at hand.

  • Pipe, structures and appurtenances
  • Crew and equipment predictions
  • Drawing-linked review queue
ESTIMATE / UTILITIESDRAWING LINKED
ITEMQTYCOST
018" PVC SANITARY
1,240 LF$78,926
0248" STORM RCP
320 LF$63,184
036" C900 WATER
890 LF$51,403
04MANHOLE 4' DIA
8 EA$34,760

LABOR

$84.2K

MATERIAL

$106.4K

EQUIPMENT

$37.7K

02 / SITE WORK

Turn dirt into production, not guesswork.

Build cut/fill quantities, haul assumptions and dirt-work crews separately from utility pricing, then see combined-award savings only when scopes come together.

  • Grid cut/fill and haul tools
  • Owned and rented equipment
  • Production-rate driven labor
CUT / FILL GRIDBALANCED
+12
-8
+24
+6
-15
+31
+18
-4
+9
+27
-11
+16

CUT

8,420 CY

FILL

8,170 CY

03 / CONCRETE + DEMOLITION

Different work. Separate resources. One bid.

Estimate concrete and demolition with their own labor, materials and equipment—without contaminating the original utility estimate.

  • Dedicated trade libraries
  • Independent crews and fleets
  • Combined overall estimate
SCOPE BREAKOUT

SITE CONCRETE

14 ITEMS · SEPARATE RESOURCES

READY

DEMOLITION

9 ITEMS · SEPARATE RESOURCES

REVIEW

SITE UTILITIES

32 ITEMS · SEPARATE RESOURCES

READY
COMBINED AWARD VIEWON

Private by default

Projects and company libraries stay scoped to your account.

Built for a 4×10 week

Labor hours and production rates feed an efficient CPM schedule.

Made for self-perform work

Utilities, dirt, concrete and demolition stay separate until you combine them.

Pricing without the sales maze

Start with real work. Scale when it pays.

Pay per project

$300per project

Two project uploads free for new signups.

  • Sample project with the full workflow
  • AI plan reading up to 10MB
  • Calibrated tracing and measurement
  • Bid sheets and exports
Get started
Recommended

Annual

$3,500per year

Built for teams pricing work every week.

  • Unlimited projects
  • Full libraries and assemblies for the first annual term
  • Full product support
  • Everything in pay per project
Get started

Full library

$500one time

Add the full estimating library to pay-per-project access.

  • Equipment, labor and CSI items
  • Expanded assemblies
  • Private company edits
  • No recurring library charge
Get started

Your next estimate

Bring the plans. Build the bid.

Start free