Load a typical job
5 ft or deeper: OSHA 1926.652 requires sloping, benching, shoring or a trench shield unless in stable rock.
Results
- Excavation
- 692.6 BCY
- Bedding & pipe zone (net)
- 168.8 CY · 236.4 tons
- Backfill above pipe zone
- 517.1 CY
- Spoil haul-off
- 219.3 LCY
- Truck loads
- 19
Show my math
- 1. Top width = 3.0 + 2 × 1 × 5.5 = 14.00 ft
- 2. Excavation = 400 × 5.5 × (3.0 + 14.00) ÷ 2 ÷ 27 = 692.6 BCY
- 3. Pipe OD = 9.05 in · pipe-zone height = (6 + 12) ÷ 12 + 0.754 = 2.25 ft
- 4. Pipe zone = 400 × 2.25 × (3.0 + 1 × 2.25) ÷ 27 = 175.5 CY
- 5. Pipe volume = 400 × π × (0.377)² ÷ 27 = 6.6 CY → net bedding 168.8 CY (× 1.4 t/CY = 236.4 t)
- 6. Backfill = 692.6 − 175.5 = 517.1 CY
- 7. Haul-off = 175.5 BCY displaced × (1 + 25%) = 219.3 LCY ÷ 12 CY = 19 loads
Assumes native backfill is reused above the pipe zone and all pipe-zone material is imported. Bedding density 1.4 tons/CY is a typical crushed-stone value — check your supplier. RCP OD uses ASTM C76 Wall B. This is a planning tool; it is not an OSHA competent-person determination.